We have extensive experience in setting out; from 1mm +- precise slab track renewal for
cross-rail to earthworks and piling for the 2012 Olympic stadium.
- Construction verification surveys
- Verticality surveys
- Piling setting out: CFA, Driven, Mini piling rigs, Vibro piling
- Manual Monitoring – slopes, retaining walls, embankments, walls and facades.
All setting out/monitoring will be conducted with either a 1” or 5” calibrated Leica TS15
total stations.